Ongoing Projects

Sr. No. Name of Work Client State
01 Development of 6-lane access controlled Ludhiana-Bathinda Greenfield highway section of NH-754AD from junction with Amritsar-Bathinda Greenfield Road (NH-754A) near Rampura Phul to junction with Moga-Barnala Road (NH-703) near village Tallewal (from Km 0+000 to Km 30+300) as a part of Ludhiana-Ajmer Economic Corridor in the state of Punjab on Hybrid Annuity Mode under Bharatmala Pariyojana phase-I (Package-1) NHAI Punjab
02 Const. of Flyover at Nand Nagri & Gagan Cinema Jn. of Mangal Pandey Marg inc. Elevated Corridor, Footpath, Road Work inc. Road Signages, Electrical Works, Drainage, Rainwater Harvesting and Allied Works on EPC Mode. PWD Delhi Delhi
03 Upgradation & Four Laning of Poanta Saheb Ballupur Section of NH-72 in the State of Himachal Pradesh & Uttarakhand under NH(O) on Hybrid Annuity Mode. Package-1: Poanta Saheb Mednipur from Design Ch. 0.000 to Ch. 18.700. NHAI Himachal Pradesh & Uttarakhand
04 Const. of 6-Lane greenfield Ambala Ring Road starting from junction with Shamli – Ambala section of NH-344GM near Vill. Kapuri (Design Km 18+226) & terminating at Ismailabad – Ambala section of NH-152 near Vill. Bhari (Design Km 40+750) (Total Length 22.524 Kms) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode. [UPC: N/02007/06005/HR]. NHAI Haryana
05 Long Term Rectification of MoRTH identified Blackspots 17 and Removal of 2 At-Grade Junctions and allied works on existing 4-6-Lane Hyderabad Vijayawada section of NH-65 from Km.40.000-Km.221.500 in Telangana on EPC mode. NHAI Telangana
06 Rehabilitation, Upgradation & Widening of existing Highway to Rigid Pavement 2 Lane/2 LPS of NH965DD from Lonand Shirval-Bhor Mandangad-Pachral section Shindewadi Phata to Varandha Ghat Dist. Border in the State of Maharashtra. MoRT&H Maharashtra
07 Work of development and construction of elevated corridor from km 38/660 to km 42/690 (from Iscon Junction to Start point of approach of Sanand Flyover) of NH-147 in the State of Gujarat. MoRT&H Gujarat
08 6 Laning of Pune Hyderabad section of NH 65 from km 493.000 to 524.000 from Sangareddy X roads to Madinaguda excluding BHEL flyover from km 520.000 to 521.650 in the State of Telangana on EPC Basis. MoRT&H Telangana
09 Earthwork, in cutting/filling, blanketing, viaduct, major bridges, minor bridges, RUBs, protection works and other allied works between Km 70.750 to Km 77.175 (6.425 Km) within Punjab area for construction of new line from Kartoli Punjab to Talwara block section of Nangal Dam – Talwara new B.G. Rail link. Indian Railways Punjab