01 |
Improvement of T Junction near Dhaula Kuan metro station including widening of national highway from Dhaula Kuan to end of junction on NH-8 and improvement of T Junction near Defence area including widening of National Highways up to Defence area on NH-8 and R&R Hospital link underpass in the state of Delhi |
NHAI |
New Delhi |
02 |
Construction of Grade Separated 4 lane U Turn on NH-8 near Ambience Mall at Km. 24.00 and Grade Separated 3 lane U Turn near DLF Phase 2 at Km 26.120 in Gurugram in the state of Haryana on EPC mode |
NHAI |
Haryana |
03 |
Const. of Elevated Structure between Km 200.90 to Km 201.700 including major bridge on Mayapuri Escape Channel at Km 201.450 in Haridwar on Muzaffarnagar Haridwar Section of NH-58 in the State of Uttarakhand |
NHAI |
Uttarakhand |
04 |
Construction of 4 Lane ROB in Km 165 (Mohkampur) on NH-72 (New NH – 07) in the state of Uttarakhand. |
PWD (Uttarakhand) |
Uttarakhand |
05 |
Const. of ROB in lieu of LC No. C-221 on NH 254 at Maur on Maur – Talwandi Road in Punjab State. |
PWD (Punjab) |
Punjab |
06 |
Const. of ROB at LC 113-B over DLI-BTI section over NH 71 at JIND |
PWD (Haryana) |
Haryana |
07 |
Construction of 4-Lane ROB at LC No. SPL-1/299/14-15 at Bathinda at RD 287.95 of NH-15 crossing Delhi-Bathinda Railway line in Punjab |
PWD (Punjab) |
Punjab |
08 |
Development of Six-Lane access-controlled highway from Design Chainage 8+130 (near Mohand) to 16+380 Daat kali Tunnel of Ganeshpur-Dehradun section of NH-72A in the state of Uttar Pradesh & Uttarakhand under Bharatmala Pariyojana on EPC mode (Package-2) |
NHAI |
Uttar Pradesh & Uttarakhand |
09 |
Construction of 4-Lane NH-344P-Package-4 (From km 0+000 to km 29+600, 29.6 km), starting from Bawana Industrial Area, Delhi (at km 7+750 of NH-344M) till Sonipat bypass of NH-352A at Village Barwasani, Sonipat in Haryana as spur of NH-344M on EPC mode |
NHAI |
Delhi & Haryana |
10 |
Construction of 6 lane Flyover at Km 315+200 & Construction of entry/exit ramp including FOB at Km. 320+840 & Const. of add. 2 lane ROB on both sides of existing 4 lane ROB at Km. 311+865 alongwith approaches & Const. of VUP at Km. 311+770 alongwith improvement of sherpur chowk on Panipat-Jalandhar section of NH-44 (Old NH-1) in Punjab State. |
NHAI |
Punjab |
11 |
Construction of Arterial Road from Umang Bhardwaj Chowk to NPR in Gurugram Haryana on EPC mode Project. |
GMDA |
Haryana |
12 |
Construction of Flyover at Sheela Chowk on the intersection of Delhi Hisar Road with RKDB road & Const. of Four lane Bridge on JLN Feeder & BSB canal on RKDB road in Rohtak City. |
PWD (Haryana) |
Haryana |
13 |
Construction of Bridge on Najafgarh drain at Tri Nagar/Inderlok, Karampura & Rampura Delhi to Cover Complete ROW excluding already constructed bridge alongwith road improvement on either side of bridge including making of drainage scheme, footpath etc. complete. |
PWD (Delhi) |
New Delhi |
14 |
Construction of 4-Lane ROB on Delhi-Rewari line at LC-31 Spl. Crossing on Gurugram Pataudi Road to Farrukhnagar road via Garhi Sadhrana at Km 2.00 in Gurugram District. |
GMDA |
Haryana |
15 |
Construction of Bridge on Najafgarh drain at Basaidarapur along with road improvement on either side of bridge drainage scheme, footpath etc. complete. |
PWD (Delhi) |
New Delhi |
16 |
Construction of Bridge on Supplementary Drain on NH-10, Nangloi, Delhi to cover complete width of 60m with road improvement in 100m length on either side of bridge including making of drainage scheme, footpath etc. complete (after dismantling the existing bridge) |
PWD (Delhi) |
New Delhi |
17 |
Construction of 2 lane ROB and its approaches in lieu of existing level crossing No. 111C at Km 300.500 on NH-71 (New NH-352) at District Jind in the State of Haryana. |
PWD (Haryana) |
Haryana |
18 |
Construction of 2 lane Elevated Road over LC No. 60 at Km. 70/6-7 on Delhi Bathinda Railway line crossing Kacha Beri road in Rohtak City Portion. |
PWD (Haryana) |
Haryana |
19 |
Construction of ROB cum RUB in lieu of LC No. B-3/2-E at Km. 4/4-5 on Ludhiana-Ferozepur section & RUB at Km 4.845 on Ludhiana-Ferozepur Section. |
Northern Railway |
Punjab |
20 |
Construction of approaches of ROB in lieu of LC No. B-25 on Ludhiana Jakhal section of Northern Railway falling on Ahmedgarh District Sangrur in the State on Punjab. |
Northern Railway |
Punjab |
21 |
Widening of RUB consisting of RCC box No. 2 & 3 of size 9.00×5.75m (Internal dimensions) each & box No. 4 of size 7.50×4.75m (Internal dimensions) by box pushing technique near Kishanganj Station. |
Northern Railway |
New Delhi |