Completed Projects

Sr. No. Name of Work Client State
1 Construction of 3 Lane ROB and Underpass at LC No. 54 on Jind Panipat Section (Location 66/9-10) crossing road alongwith Delhi Water Carrier Link Channel (CLC) in Panipat Distt. Haryana PWD Panipat
2 Construction of 4 Lane ROB in Km 165 (Mohkampur) on NH-72 (New No. 07) in Dehradun in the State of Uttarakhand in EPC Mode. Job No.: 72 (New No. 07)-UR-2014-15-002-S&R(B)) Uttarakhand Nothern Railways
3 Construction of Single Lane Limited Height Subway in lieu of U/M LC No. 5 (Km. 5/4-5), LC No. 10 (Km. 12/1-2), LC No. 23 (Km. 28/7-8), LC No. 37 (Km. 43/9-10), LC No. 39 (Km. 46/12-13), LC No. 42 (Km. 51/11-12), LC No. 44 (Km. 54/12-13), LC No. 57 (Km. 73/3-4), LC No. 58 (Km. 73/11-12) and LC No. 59 (Km. 77/3-4) (Total 10 Nos.) on Narwana – Kurukshetra section of Delhi Division (By Cut and Cover Method) Haryana Nothern Railways
4 Construction of Rail Over Bridge (ROB) in lieu of Level Crossing No. C-221 at Km. 104.950 on NH 254 at Maur on Maur – Talwandi Road in the State of Punjab on EPC Mode. Punjab PWD Ferozpur
5 Improvement of T Junction near Dhaula Kuan Metro Station including widening of National Highway from Dhaula Kuan to end of Junction on NH-8 and Imrpovement of T Junction near Defense area including widening of National Highway up to defense area on NH-8 and R&R Hospital Link underpass in the State of Delhi on EPC Mode. Delhi NAHI
6 Six laning of Panipat-Jalandhar from Km. 96.000 to Km. 387.10-Providing of underpass for the resident of village Pratap Garh- Construction of Major Bridge and their approaches on service road adjacent to existing Sarswati Bridge at Km 160+100 on NH-14 (Old NH-1) in the state of Haryana on EPC Mode. Haryana NHAI
7 Construction of Elevated Structure between km 200. 900 to km 201. 700 including major bridge on Mayapuri Escape Channel at km 201.450 in Haridwar on Muzaffarnagar – Haridwar Section of NH 58 in the State of Uttarakhand Uttarakhand NHAI
8 Constructon of Arterial Road from Umang Bhardwaj Chowk to NPR in Gurugram Haryana on EPC Mode Project Haryana GMDA
9 Construction of 02 lane single span steel bridge across narwana Branch canal at RD 164950 near village lsmailpur Ambala Haryana Nothern Railways
10 Construction of 2 Lane ROB and its approaches in Lieu of existing LC No. 111-C at Km. 300.500 on NH-71 (New NH 352) at District Jind in the State of Haryana on EPC Mode. Haryana PWD Jind
11 Construction of 4-lane ROB on Delhi-Rewari -Railway line at LC-31 Spl Crossing on Gurugram Pataudi Road to Farukhnagar road via Garhi Sadhrana at Km. 2.00 in Gurugram District. Haryana PWD Gurgaon
12 Construction of Grade Separated U-Turns at Km 24 near Ambience Mall and at Km 26.120 near DLF Phase-2, Gurugram on NH-48 (Old NH-8) Haryana NHAI
13 Work of construction of 2-lane Elevated road over LC No. 60 at Km. 70/6-7 on Delhi Bhatinda Railway line crossing Kacha Beri road in Rohtak – City portion Haryana PWD
14 Widening of RUB consisting of RCC Box No. 2 & 3 of size 9.00×5.75 (Internal Dimensions) each & Box No. 4 of size 7.50×4.75m (Internal Dimensions) by box pushing technique near Kishanganj Station. Delhi Nothern Railways
15 Construction of Bridge on Najafgarh drain at Basaidarapur along with road improvement on either side of bridge drainage scheme, footpath etc. complete. Delhi PWD New Delhi
16 Construction of Bridge on Supplementary Drain on NH-10, Nangloi, Delhi to cover complete width of 60 m with road improvement in 100 meter length on either side of bridge including making of drainage scheme, footpath etc. complete (after dismantling the existing bridge). Delhi PWD New Delhi
17 Construction of Bridge on Najafgarh Drain at Tri Nagar/Inderlok, Karampura and Rampura, Delhi to cover the complete Right of Way (ROW) excluding area of already constructed bridge alongwith road improvement on either side of bridge including making of drainage scheme, footpath etc. complete. Delhi PWD New Delhi
18 Construction of Flyover over at Sheela Chowk on the intersection of Delhi – Hisar Road with RKDB Road & Construction of Four Lane Bridge on JLN Feeder and BSB Canal on RKDB Road in Rohtak City Haryana PWD Rohtak
19 Construction of approaches of ROB in Lieu of LC No. B-25 at Km 25/5-6 on Ludhiana Jakhal section of Northern Railway falling on Ahmedgarh Pohir Road at Ahmedgarh District Sangrur in the State of Punjab inc. Main Road, Const. of LHS (Limited Height Subway), Service Roads, Diversion Roads and Junction etc. Punjab PWD Malerkotla
20 Construction of ROB at LC No. 6B on Hisar – Mangli – Sharwa Road Hisar (CM Announcement No. 20371 Dated 03.11.2018) Haryana PWD Hisar
21 Reconstruction of Single Span Steel Bridge at RD 11526, RD 23000 of BML Barwala Link Channel and RD 321210 of Sirsa Branch. Haryana Nothern Railways
22 Construction of 2 Lane ROB over LC No. 60 at Km. 70/6-7 over Delhi Bathinda Railway Line Crossing Kacha Beri Road in Rohtak Town – Railway Portion Only Haryana PWD Rohtak
23 Construction of Road Over Bridge cum Road Under Bridge in lieu of Level crossing No. B-3/2-E at KM 4/4-5 on Ludhiana-Ferozepur section and Road Under Bridge at KM 4.845 on Ludhiana-Ferozepur section. Punjab Nothern Railways
24 Construction of six lane Flyover at km. 315+200 and Construction of entry/exit ramp from km. 320+300 to km. 321+200 including FOB at km. 320+840 and Construction of Additional Two Lane ROB on Both sides of Existing Four Lane ROB at km. 311+865 along with approaches and Construction of YUP at km. 311+770 along with Improvement of Sherpur Chowk on Panipat – Jalandhar section of NH-44 (Old NH-1) in the State of Punjab Punjab NHAI
25 Construction of Road Under Bridge in lieu of LC No. Spl-52/E-3 at km 70.051 on ASR-PTK section, Construction of Road Over Bridge of span 1×30.00 mtr Bow-String Girder in lieu of LC No. A-2/E-2 at km 02/7-9 between JRC-SCPD on JRC-PTK section of Firozpur division and construction of 4-lane Road Over Bridge of span 1×48.0 mtr at km 07/0-1 on Ludhiana-Dhuri section of Ambala Division Punjab Nothern Railways
26 Construction of Road Over Bridge consisting of composite steel girder 1x42700mm (SK) (Launching in traffic block), PSC girders span lx18800mm (SK) (Launching not required traffic block) and allied works connecting Narefa- Bawana Sub City to NH-1 over MP Road at Railway Km. 24/20-18 on Delhi-Ambala Section Near Anaj Mandi Narela Delhi Nothern Railways
27 Construction of ROB including approaches of existing level crossing no. B-31 at Km 224.400 of NH-15 (New NH-54) at Faridkot in the State of Punjab. Punjab PWD
28 Construction of Arterial Road from Umang Bhardwaj Chowk to NPR in Gurugram Haryana on EPC Mode Project. Haryana GMDA
29 Construction of Permanent Steel Truss Superstructure Road Bridge High Level 40.20M long over running Narwana Branch at RD 7245ft. and 51.20M Long over running Bakhra Main Line Canal at RD 165600 ft. crossing G.T. road NH-I Sirhind to Bhadson via Tarkheri Road in Km. 1.51 and 4.265 respectively including approaches 6Mx3M culvert in RD 1580, in Distt. Fatehgarh Sahib. Punjab PWD
30 Construction of 4 Lane ROB at LC No. SPL-1/299/14-15 at Bathinda at RD 287.95 of NH-15 crossing Delhi Bathinda Railway Line in the State of Punjab on EPC Mode Punjab PWD
31 Construction of Elevated road over Barapullah Nallah consisting of steel girder span 1 x53543mm (Launching required traffic block), Steel matching Girders towards Aurbindo Marg 1 x 19830mm Average and Steel matching Girders towards Sarai Kale Khan side 1 x 24305mm average (Launching not required traffic block), PSC girders span 2x32270mm + 2 x (32270 + 21600 mm) (Launching not required traffic block) starting from Sarai Kale Khan to Aurbindo Road near INA market. Phase-II Delhi Nothern Railways
32 Construction of Flyovers in Akola City in the State of Maharashtra on EPC Mode Maharashtra NHAI
33 Upgradation of NH-81 with a minimum of 2-Lane with paved shoulder configuration starting from km 19.205 to km 46.550 in the District of Malda on EPC mode in the state of West Bengal. West Bengal PWD