1 |
Construction of ROB and its approaches In lieu of existing level crossing No.138-B at KM 1.45 on NH-21A (New NH-105) at Pinjore (Pinjore-Baddi Section) In the State of Haryana on EPC Mode |
Haryana |
2 |
Development of Six- lane access-controlled highway from Design Chainage 8+130 (near Mohand) to 16+380 Daat kali Tunnel of Ganeshpur – Dehradun section of NH-72A in the state of Uttar Pradesh & Uttarakhand under Bharatmala Pariyojana on EPC mode (Package-2) |
Uttarakhand & Uttar Pradesh |
3 |
Construction of 4-lane NH-344P-Package-4 (From km 0+000 to km 29+600, 29.6 km), starting from Bawana Industrial Area, Delhi (at km 7+750 of NH-344M) till Soni pat bypass of NH-352A at Village Barwasani, Sonipat in Haryana as spur of NH-344M on EPC mode |
Haryana & New Delhi |
4 |
Development of 6-lane access controlled Ludhiana-Bathinda Greenfield highway section of NH-54AD from junction with Amritsar-Bathanda Greenfield Road (NH-754A) near Rampura Phul to junction with Moga-Barnala Road (NH-703) near village TallewaJ (from km 0+000 to km 30+300) as a part of Ludhiana-Ajmer Economic Corridor in the state of Punjab on Hybrid Annuity Mode under Bharatmala Pariyojana Phase-l (Package- I ) |
Punjab |
5 |
Upgradation and Four Laning of Poanta Saheb-Ballupur Section of NH-72 in the State of Himachal Pradesh and Uttarakhand under NH(O) on Hybrid Annuity Mode. Package-I: Poanta Saheb – Mednipur from Design Ch 0.000 to Ch 18.700 |
Uttarakhand & Himachal Pradesh |
6 |
Construction of HL Bridge SYL and Narwana Branch Canals on Karnal Kachwa Sambli Kaul Road (Road ID 7370) in Karnal District (Under CRF Scheme) |
Haryana |
7 |
Construction of Flyover at Nand Nagri & Gagan Cinema Junction of Mangal Pandey Marg including Elevated Corridor, Footpath, Road Work including Road Signages, Electrical Works, Drainage, Rain Water Harvesting and Allied Works on EPC Mode. |
New Delhi |
8 |
Construction of 6-lane Greenfield Ambala Ring Road starting from junction with Shamli-Ambala section of NH-344GM near Village Kapuri (Design km 18+226 ) and terminating at Ismailabad – Ambala Section of NH-152 near Village Bhari (Design km 40+750) (Total length 22.524 Kms) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode |
Haryana |
9 |
Repair and rehabilitation of Neelam and Badkhal Flyover at Faridabad |
Haryana |
10 |
Construction / Widening of Structures i.e., Major Bridges, Minor Bridges, ROBs, Culvert, LVUP, Hump Subway, rectification of drainage system, Entry/Exit, rectification of rain cuts and other miscellaneous works at various locations on Panipat-Jalandhar section of NH-I (new NH 44) from Km 96+000 to 387+ I 00 in the State of Haryana and Punjab |
Haryana & Punjab |
11 |
Work of Development & Construction of Elevated Corridor from km 38/660 to km 42/690 (from Iscon Junction to start point of approach of Sanand Flyover) of NH-147 in the State of Gujarat on EPC Mode |
Gujarat |
12 |
Long Term Rectification of MoRT&H identified Black Spots (17 Nos) & removal of 2 at grade junctions and allied works on existing 4/6 lane of Hyderabad-Vijaywada Section of NH-65 from Km 40.000 to Km 221.500 in the State of Telangan on EPC Mode |
Telangana |
13 |
6 Laning of Pune – Hyderabad section of NH-65 from Km 493+000 to 524+000 from Sangareddy X roads to Madinaguda (excluding BHEL Flyover from Km 520+000 to 521+650) in the State of Telangana on EPC Mode. |
Telangana |
14 |
Rehabilitation, Upgradation & Widening of existing Highway to Rigid Pavement 2 Lane/2 Lane with Paved Shoulder of NH 965DD from Lonand – Shirval – Bhor – Mandangad – Pachral Section Shindewadi Phata to Varandha Ghat Dist Border from Km 33/550 to 92/550 (Design Ch. 33+550 to 91+003) (Total Design Lenght = 57.453 Km) in the State of Maharashtra on EPC Mode. |
Maharashtra |
15 |
Earthwork, in cutting/filling, blanketing, viaduct, major bridges, minor bridges, RUBs, protection works and other allied works between Km 70.750 to Km 77.175 (6.425 Km) within Punjab Area for Construction of new line from Kartoli Punjab to Talwara block section of Nangal Dam – Talwara new BG. Rail Link |
Punjab |
16 |
Work of Construction of approaches of 2 Lane RUB on Sonipat Ganaur Road at Km 10.50 crossing Rajlu Garhi to MMLP Barhi Railway Line at EP55/9A and 55/10 in Sonepat District. |
Haryana |
17 |
Extension of Ashram Flyover to ONO Flyover (SH: FOBs, Ramps, Footpath, Road Work including road signage, street light works, drainage & allied works. |
New Delhi |